
Social initiative — Isfara, Tajikistan
Kontakt International School
Construction time10 months
- Floor area
- 10,600 m²
- Students
- 800
- Grounds
- 1.2 ha

International construction company
Pipelines and stations in Western Siberia, schools and residential quarters in Central Asia. The full cycle — from survey to commissioning.
01Manifesto
From an oil pipeline in the taiga to a school for 800 students — every asset has one job: to work long and reliably.
Mission
To create prosperity through construction.
02Company
A full-cycle construction company: industrial and civil construction, reconstruction and maintenance of oil and gas production and transportation facilities.
We build comfortable, safe and environmentally sound places to live and work — in a spirit of partnership and mutual benefit.

Geography
Key clients in Russia
Gazprom Neft PJSC · Rosneft Oil Company PJSC
03Projects
Oil and gas infrastructure, housing, education, retail. Every asset is built to perform.

Social initiative — Isfara, Tajikistan
Construction time10 months

Residential — Isfara, Tajikistan
Construction time24 months

Commercial — Isfara, Tajikistan
Construction time18 months

Social initiative — Nizhnevartovsk, Russia
Construction time38 months

Oil & gas infrastructure — Kharampur field, Russia
Construction time14 months

Rotational camp — KhMAO — Yugra, Russia
Construction time12 months

Social initiative — Isfara, Tajikistan
Construction time12 months

Industrial — Isfara, Tajikistan
Construction time10 months
04Track record
Process and infrastructure facilities across the fields of Western Siberia. Next to each one — the time it took to build.
Facility / Duration
Booster pump station
West Ust-Balyk field
9months
Booster pump station
Novo-Pokur field
8months
Booster pump station
Achimov field
11months
Booster pump station
Chistinnoye field
11months
Gas-turbine power plant
Tailakov field
11months
Reconstruction of the gas condensate receiving and storage unit
Agan field, oil treatment facility No. 2
22months
Process and storm drainage for 3,000 m³ tanks Nos. 1–4
Novo-Pokur field, stage 3
10months
Reconstruction of flare stacks and HP/LP flare gas lines
Operating facility
3months
Multiphase and vacuum compressor station
Chistinnoye field
4months
Multiphase and vacuum pump station
Achimov field
4months
Facility / Duration
Rotational residential complex: 12,000 m², 27,000 m² of landscaping
Kharampur field
18months
5 dormitories, 2 sports and wellness complexes, a canteen
Priobskoye field
12months
Dormitory
Tailakov field
10months
Dormitory
Zhagrin field
6months
05Services
The full turnkey scope with our own resources — from classic projects to bold engineering solutions.

Turnkey infield and trunk pipelines: from right-of-way preparation to testing and commissioning — including in severe climates.

Booster pump and compressor stations, gas-turbine power plants, rotational camps. A proven rotational method for remote fields.

Residential complexes, schools, retail centres and public buildings. Design and construction in one team — from foundations to finishes.

Construction of high-voltage overhead lines that power fields and site facilities — from tower foundations to connection and testing.

Our own fleet from the world’s leading manufacturers, run by experienced operators. Rapid long-distance mobilisation.

Non-destructive testing of welded joints and testing of electrical installations: acceptance, periodic, preventive. Reports are legally valid for supervisory authorities.
06Expertise
Technology that lets us build where ordinary construction stops: in the marshes of Yugra, on remote fields and beneath live trunk lines.

89–1420mm
Manual welding up to 530 mm and an automatic complex for 530–1420 mm pipe.
50–1000mm
HDD rigs pass beneath roads and rivers without disturbing the topsoil.
3laboratories
Non-destructive testing, an electrical laboratory and a construction materials laboratory.
5.5ha
A rail siding, a 180-bed dormitory and mobile concrete plants — construction without downtime.
07Resources
A 5.5-hectare production base with a rail siding and a 180-bed dormitory, three laboratories and a fleet of 301 units.

Fleet utilisation
Fleet structure
01
The average fleet age is 2 to 5 years. We choose machines that meet production, safety and environmental requirements.
02
Our people are our main asset: experienced drivers and operators with every required qualification.
03
Infield, cargo and passenger transport for construction work of any complexity.
04
Continuous modernisation and scheduled maintenance keep the fleet ready for tasks of any scale.
Machinery manufacturers

Service life
100–130 thousand hours: how long the main units of the gas-turbine power plants we build run without a major overhaul.
08Principles
Five principles every employee follows — whatever the role or the country.
Everything we do is built on the idea of quality.
09Process
A transparent path from the first meeting to a working facility.
01
We study the site, climate and logistics, and plan how to mobilise people and machinery.
OutcomeConcept and budget
02
Our in-house design team develops solutions around every client requirement.
OutcomeDesign documentation
03
Estimates, schedules, selection of machinery and materials. Engineering saves cost from day one.
OutcomeSchedule and resources
04
Our own crews and fleet. We run works on several sites at the same time.
OutcomeThe asset in steel and concrete
05
Testing, laboratory control, as-built documentation and commissioning.
OutcomeA working facility